Go to main contentsGo to main menu
Sunday, September 22, 2024 at 6:29 PM
Ad

TxDOT to begin sealcoat project

TXDOTToBegin STOCK

From Enterprise Staff

Texas Department of Transportation crews will set barricades this week in various locations throughout the Lufkin District as annual sealcoating operations are expected to begin by July 17, weather permitting.

The sealcoat process extends the life of an asphalt roadway and enhances the safety of the roadway by helping to prevent cracks and potholes.

Roads in Polk County that are scheduled for sealcoat treatment and the work limits for each include: FM 356, from the Trinity County line to the end of state maintenance; FM 3126, from U.S. 190 to FM 2457; and FM 350, from U.S. 190 to the end of state maintenance.

As the sealcoat project begins, motorists are urged to remember this is a moving operation. There will be signs, barricades and traffic control in place. Reduce speed and obey all traffic control. Stay alert for workers near the lane of traffic and moving equipment throughout the work zone. For more information, contact [email protected] or call 936-633-4395.


Share
Rate

Comment
Comments
Ad
Ad
Ad
Ad
Ad
Ad
Ad
Ad
Ad